Acting as main contractor, TRAC undertook the initial structural survey, using rope access techniques, for project engineers Stirling Maynard Construction Consultants and identified the problem. Helifix then designed a suitable repair involving a combination of DryFix and ResiTie remedial ties and TRAC undertook the installation programme from suspended cradles.
The ties were installed in a triangular arrangement to provide a truss-like action that would ensure both vertical and lateral support for the cladding. No taking down and rebuilding was required and the car park remained open throughout the contract. |