ISP Architects, project architects for design and build contractor Mowlem Plc (now part of Carillion), provided the Helifix Technical Department with drawings and details of the school’s roof construction and were then provided with an InSkew specification.
Due to its size and location, the 2,300m2 roof with pitches ranging from 20°-27°, required 22,000 x 190mm InSkews to secure the counter battens through 100mm of insulation.