APPLICATIONS
  • Where far leaf is a thin wall hollow block CemenTie uses a grout filled sock sleeve to provide a secure bond: grouted in both leaves, particularly from the fourth floor upwards to comply with fire regulations.

  FEATURES
  • Accommodates normal building movement.
  • Able to bond with thin wall far leaf.
  • Far leaf security of fixing easily proof tested.
  • Effective in all common building materials.
  • Tie, sock sleeve and grout create excellent bond.

  BONDING AGENT
  • HeliBond cementitious grout.
  INSTALLATION

Drill 12mm clearance hole in both leaves and flush clean. Place sock sleeve over grout gun nozzle, insert into hole in far leaf and inject sufficient grout to fill sock. Insert CemenTie, with plastic sleeve fitted, into sock. Inject grout to fill hole in near leaf and make good.


  BENEFITS
  • Highly economical and effective.
  • Efficient remedial wall tie for high rise blocks.
  • Leaves building virtually unmarked.
  • Minimal inconvenience to occupants.
  • Multiple drip points prevent transfer of water across cavity.